Project manager, architect or coordination: who should run your works
Who should run your works? Scopes, the legal threshold and the trade-offs for choosing between project manager, architect and coordination from abroad.
Before launching any works, one question comes before all others: who should run them? The architect designs the project, handles the administrative file and directs execution; French law makes one mandatory above a surface threshold for works subject to planning permission. The project manager designs and directs more modest projects, from drawings to site supervision. Works coordination, last, organises the daily routine of the site for an absent owner: access, appointments, reminders, reports. The right choice depends on the scale of the project, and an owner living abroad rarely arbitrates like one who is present.
This page compares the three roles and completes the guide running building works from abroad.
What exactly does each role cover?
The three figures complement one another more than they compete. The architect intervenes on the project as a whole: outline, drawings, planning permission, tendering, direction of the works. The project manager covers a similar spectrum on operations that stay below the legal threshold: studies, drawings, tendering, coordination of trades, site supervision. Coordination, for its part, designs nothing: it organises, checks and reports, on behalf of an owner who cannot be there.
| Role | Scope | For which project |
|---|---|---|
| Architect | Design, permits and authorisations, full direction of the works | Conversions above the legal threshold, structural projects, changes to structure or facade |
| Project manager | Studies and direction of the works: drawings, tendering, supervision | Full renovations below the threshold, reshaping of homes |
| Works coordination | Organising the daily routine: access, schedules, appointments, photographic evidence, reports | Works by trade run by the owner, a presence relay for a property held from a distance |
The boundary is drawn first by design. As soon as something must be drawn, partitions moved, a layout reworked or a planning file assembled, you need a designer, architect or project manager. When the project is already framed, with a written list of works, and the real difficulty is the owner’s absence, coordination becomes the heart of the arrangement.
Then comes the question of contracts, which clarifies responsibilities. With the architect or project manager you sign a brief for design and direction of the works; separately, you sign with each tradesperson retained, because you remain the client for your own property. Coordination, for its part, is covered by a brief for organisation and reporting. Three distinct documents, three readable scopes: a little paperwork at the start, and a great deal of clarity afterwards, notably on the day a question of responsibility arises.
What does an absent owner gain from delegating the running of the works?
An owner who is present absorbs a building site’s daily routine without thinking: answering the tradesperson at the door, settling a finish on the spot, seeing progress at a glance. An owner abroad cannot. Every question becomes a message crossing time zones, every unplanned visit a missed opportunity, every silence a worry.
Delegating the running changes that relationship with time:
- Tradespeople’s questions get an answer during your meeting hours, not when you wake up.
- Technical visits take place without you, with someone who knows what to look at and what to ask.
- Evidence of progress arrives filtered, dated and filed, instead of scattering across messages and calls.
- The chasing nobody enjoys but everything depends on is carried by someone whose role it is.
- A single contact knows the project end to end and prevents contradictory versions.
The gain is not mere comfort: a better-relayed site is a site that moves, because tradespeople work better when answers and access keep up. On this point, the works and renovation coordination service is designed precisely for non-resident owners: your dedicated contact organises access, tracks milestones and reports back, in France as from your country of residence.
How do you decide according to the scale of the works?
Three scenarios cover most situations. The first: one-off works, a single trade, a bathroom to redo, a floor to replace, a full repaint. The tradesperson works alone, under your direct ownership, and coordination is limited to organising access and monitoring: nobody needs a designer.
The second: a full renovation without structural change. The project needs drawing, the trades follow one another, the interfaces multiply. A project manager then structures the operation, or solid coordination plays the orchestrator if your choices are already settled. It is the scenario where absence weighs most, because it is the one with thousands of small decisions.
The third: a heavy conversion, full reshaping, an extra storey, an extension, a facade refurbishment tied to a renovation. The architect becomes unavoidable, sometimes because the law requires one given the surface, always because the administrative file and the direction of the works demand it. The pillar running building works from abroad details the method that applies afterwards, whichever lead you choose.
One note for co-owned buildings: some works, such as a facade refurbishment voted at the general meeting, escape your individual arbitration. The decision is collective, execution goes through the managing agent, and your margin for manoeuvre concentrates on the interior layout and the monitoring of your own lots.
One last piece of arbitration advice: when the scale leaves you unsure, test the lead before the big project. Entrusting a secondary trade, a make-good or a supervised repair lets you gauge the quality of the reports, the reliability of the chasing and the precision of the information passed back. The relationship that will carry a full renovation is better tested on a modest brief than on a promise of appointments: the steadiness of a documented report says more than a sales folder.
How do you keep the final decision?
Delegating the running does not mean delegating the project. The rule protecting your control rests on three levels. The lead prepares: gathering the facts, asking the questions, proposing reasoned trade-offs. You decide: choice of work, of visible materials, of the calendar, of budgets added along the way. The lead executes the decision: passing it on, documenting it and checking it is applied.
In practice, fix from the start of the brief what must come back to you:
- Anything changing the agreed budget or scope.
- Anything touching visible materials and finishes.
- Any schedule slippage, as soon as it moves an announced milestone.
- Site discoveries, in photos, with the tradesperson’s technical opinion.
That trio, prepare, decide, execute, has a further virtue of record: every important decision is found dated, reasoned and documented. On the day a question comes back, and on a building site questions always come back, the written answer is already there. And the reporting rhythm, fixed at the start of the brief, turns monitoring into a habit rather than a permanent negotiation: that steady routine is what makes the distance bearable, for you as for those doing the work.
This written framework avoids the two symmetrical pitfalls: the lead who decides in your place, and the owner consulted about everything, down to the position of a socket. Properly set, the arrangement gives you back exactly what distance takes away: the ability to decide quickly, on reliable facts, when it matters.
To choose the right way of running works on your French property, the Travaux & rénovation category continues the reading, starting with the neighbouring article on the energy renovation of an older property. And if you want to arbitrate calmly, French Realty offers a personal study: your dedicated contact will assess the scale of your project and tell you which arrangement suits it.
Frequently asked questions
Is an architect mandatory for all works?
No. French law makes one mandatory above a surface threshold, for works subject to planning permission. Below it, and for many renovations, hiring one remains possible but is your choice.
Does works coordination replace a project manager?
No: coordination organises, relays and reports, but design and technical direction remain with building professionals. The two roles complement each other, especially for an owner living abroad.
Who chooses the tradespeople when the works are run for me?
You do, ultimately. An architect or project manager proposes a selection and opinions; a coordination service passes on quotations and prepares their comparison. The decision to engage, like payment, stays in your hands.